Basic Description
Outfitted with the zero leak bidirectional checking sole-noid valves, this electrical power unit is intended for the operation of two independent circuits. Which are respectively to the major and subordinate platforms from the double scissors lift. Two cut-off valves are made use of for lowering the machine manually in situation of electrical power loss. If extra independent circuits are needed for your application please make contact with us for availability.
Remark: 1. Please talk to our sales engineer to the diverse pump displacement, motor energy or tank capability.
2. CSA or UL certified motors can be found upon request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which can only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic elements concerned ahead of set up of the electrical power unit.
3. Viscosity in the oil shoud be 15~46 cst,as well as the oil must be clean and cost-free of impurities,N46 hydraulic oil is recommended.
4. The power unit should really be mounted vertically.
5. Check the oil level inside the tank right after the first operating of your power unit.
six. Oil shifting is required right after the original 100 operation hours,afterwards after every single 3000 hours.